Car swing on the way
The manufacturing of the Car Swing is taking speed: Emile (MasterMilo) is working daily on the production since the beginning of December. We hoped to have it ready and make the first looping before Christmas, however that turned out not feasible. Now we aim at finishing it during the first weeks of January.
The first photo shows the assembly of one of the small side arms of the swing from H-beams of steel and diagonal bars for strength. The front side will be connected to the central axle while to the far end the cables will be attached.
This is the first set-up of half of the ramp onto which the car will drive when passing by the ground such that it can gain speed. The distance between the two tracks can be adapted and tuned to perfectly fit with the tires of the car.
In the back the large framework is visible onto which the car swing will be mounted. This was already build during the summer and was 'tested' by Emile as a 'normal' swing in which you can swing to go overhead.
At the right of me you can see the large construction onto which the car will be mounted, made of round steel tubes. Below a team photo. The videos of Emile of the complete production of the Car Swing can be seen at his Werkplaatsvlog.